Projects - Underway / Upcoming

Project Name: 2018 Sidewalk Program Upcoming

2018 Sidewalk Program Street Listing (PDF) 

2018 Sidewalk Project Location Map (PDF)

Contractor

  • Section A - Durst Brothers Excavating 
  • Section B - A-1 Leveling
  • Section C - Multi-Task

Project Description

Sidewalks are to be repaired that are in poor condition. Section A is replacement of concrete, sidewalks and aprons; Section B is sidewalk blocks raised; and Section C is the concrete portion of the street program.

2019 Unclaimed Project Letters List

Attached is a list of address of those who have not claimed their letter of notification. Please verify with the City if your address is on this list. 

Project Name: 2018 Street Improvement Program upcoming

2018 Street Program - List for street improvements (PDF)

2018 Street Listing Map (PDF)

Contractor

  • Section A Street Improvements - John R. Jurgensen (Milling and Paving)
  • Section B - Pavement Technology, Inc. (Reclamite)
  • Inspectional Services - Bowser Morner

Project Description

Streets have been identified to be repaired that are in poor condition. Section A is Street Improvements; Section B is Reclamite Surfacing; and Inspectional Services.